Granger Construction managed the North Lake Correctional Facility project for Florida-based GEO Group, Inc (formerly called Wackenhut Corrections Corporation. This was a 369,782 SF expansion of the former Michigan Youth Correctional Facility (which Granger also built for GEO Group).

Our team completed this project in two phases. Both phases were design-build arrangements, with Granger providing a negotiated lump sum cost for the design and construction and managing the work (at our risk) within the construction funds authorized.

Phase 1:

In phase one, our team expanded a small, custody-only facility into a significantly larger, mixed-custody facility, capable of serving multiple jurisdictions. This expansion increased the facility’s square footage from 167,000 SF to 382,000 SF. It also increased bed capacity from 570 to 1,889.

The new facility included two kitchen and dining facilities, sized to provide three meals per day for 2,200 inmates. The first kitchen is for food preparation and the second is for food service.

During this phase, we recommissioned the entire security, electrical and mechanical infrastructure of the original facility, assimilating the original physical plant into the new complex. This created an economical, integrated plan rather than two separate systems.

Our team managed to deliver phase one of this project in only 18 months. According to the Owner, we also demonstrated efficiency and a high level of quality not seen in their extensive experience with other Design-Build teams.

Phase 2:

In phase two, our team completed a 12 pod addition. This added 52 cells per pod, with each cell accommodating 2 inmates. In all, this increased the facility’s maximum capacity by 1,248 inmates.

During this phase, we added 3 centralized security control rooms. Each control room offered visual and electronic surveillance for 4 separate cell blocks, integrated for optimum security management. We also installed a state-of-the-art perimeter security system, including a non-lethal stun fence, video visitation monitors and phone systems.

Our team constructed a garage and bunkhouse to host 24/7 emergency medical personnel and transportation. We also renovated the facility’s medical/dental suites, adding x-ray machines, additional healthcare related patient rooms and administrative areas.

LOCATION:
Baldwin, Michigan

COST:
$68 million

SQUARE FOOTAGE:
369,782

SERVICE:
Design-Build

START:
June 2008

COMPLETION:
August 2011

ARCHITECT:
Neumann/Smith Architecture
and HDR